Before working required training base. In this case, remove the wallpaper from the walls, clear them from the old loose plaster, paint, etc.. Work with their hands should be carefully, not to damage the wiring, electricity room is better to turn off. See the same article about alignment walls plasterboard video and photo instructions included.
Leveling plaster walls with his own hands
The cleaned surface must be primed. primer most conveniently applied by roller. If the surface absorbs breaking bar, then applied two coats of primer. Beacons are installed only after the primer is completely dry. In the top corner wall hammered nail, which tied the cord (thread) loaded with, it turns plummet. You must wait until the plummet stop rocking. Then hammered another nail into the base of the wall so, his head was in line with the plumb thread. Do the other side of the wall the same operation. After this lighthouse stretched cord from nail to nail diagonally. Usually smooth or rake puts a nail head, shall be verified level, then the space between the rule and the wall must be filled with a mixture of construction. We get a flat line Beacon. The distance between the beacons is determined by a tool length, surface which will be executed plastering.
Once dried beacons can start leveling walls plaster beacons with video instruction. Plaster mixes are best used in living rooms, cement - in wet (kitchen, bathroom). Construction mixture was poured into a large water tank and shuts. Mixed with a special drill nozzle. The resulting mixture must not be too fluid or too thick. For better adhesion mixture to the wall, desirable to moisten the surface of. On the wall of a small spatula soaked throws mortar. When the alignment is carried out on plaster walls beacons, the mixture thus throws, to cover all the cracks, potholes, gap and its level should extend beyond the beacons HA3 mm. Before the mixture is dry it should be smoothed. To do this, use a broad rule, moving it to neighboring beacons from the bottom up. If the mixture is not enough, it must dokidat, or gently applied with a spatula. After finishing work on the same site, proceed to the next, so the whole wall plastered. Plastered surface after dry rough and serves as the basis for spackling. Filler can remove small defects on the wall (up to 15 mm). After the plaster has dried, the surface can be sanded with sandpaper. Now watch the video lessons online apartment repair their hands, based on the program "The world repair".
Leveling plaster walls video beacons
Another video tutorial