Calculation of materials on the floor screed in the room online

Before you mount the flooring need to align all the floors in the apartment or room. For floor screed mainly used cement-sand solution. competently and accurately is necessary to save the budget to calculate the required amount of materials for a future solution to the floor screed. The calculation can be made using the online calculator for calculating floor screed.

The values ​​given in meters, pay attention to the thickness. Specify in this format (0.00 m)

The width of the room
The length of the room
The height of the screed
Cement kg.
Sand kg.
water l.

An example of calculating the number of necessary materials.

To calculate the required volume of solution use the formula:

S × h = V

Where,

  • S - area of ​​the room;
  • H - height of the required tie layer;
  • V - the volume of solution needed.

As above formula, we can calculate the required amount of dry mixture. The important points in calculating the required volume of solution is the fact, the volume of cement solution, sand and water is less than the total amount of all ingredients. So from one kilogram of the cement-sand mixture, after addition of water is obtained 0,7 kg. solution. Thus we obtain the required volume of solution formula:

The volume of the dry mixture / 0,7 The volume of solution required =

Cement and sand is sold in bags with pay per kilo, so we need to calculate the amount of ingredients in kilograms.

Assuming, what:

  • one cubic meter of the cement-sand mixture weighs 1540 kg
  • cement cube is 1300 kg substance
  • in a cube of sand - 1625 kg
  • The ratio of cement to sand in solution 1 to 3
  • Can form separate ingredients generalized formula.

M c =( S × h /0,7) ×325

M P =( S × h /0,7) × 1220

Where,

  • M p - the mass of cement needed;
  • M n - mass of sand required;
  • S - surface area;
  • h - height of the layer.

Total. Using the online calculator floor screed, in practice, you can avoid additional costs and find out the amount of material.

Table volume proportions for different grades of concrete

Concrete, mark

The ratio of cement / sand / gravel

cement M 400

cement M 500

100

1,0 : 4,0 : 6,0

1,0 : 5,2 : 7,0

150

1,0 : 3,1 : 5,0

1,0 : 4,0 : 5,8

200

1,0 : 2,4 : 4,1

1,0 : 3,1 : 4,8

250

1,0 : 1,8 : 3,3

1,0 : 2,4 : 3,9

300

1,0 :1,6 : 3,2

1,0 : 2,1 : 3,6

400

1,0 : 1,1 : 2,5

1,0 : 1,4 : 2,7

450

1,0 : 1,0 : 2,1

1,0 : 1,2 : 2,4

cement brand

Marc solution

The rate of application for the cement manufacturing 1m3 solution

M400

M200

490 kg

M500

M200

410 kg

M400

M150

400 kg

M500

M150

330 kg

Table concrete brand relation to the quantity of cement, sand, gravel
Table concrete brand relation to the quantity of cement, sand, gravel
grade of concrete
Table relation to the amount of concrete brand

Share with your friends to vote record

Rate post:
1 Звезда2 Звезды3 Звезды4 Звезды5 Звезд (6 assessments, the average: 4.00 of 5)
Loading...
Do you want to place the information in this or any other article - contact, discuss.

Share your experience in the repair

Your email address will not be published. Required fields are marked *

twenty + seven =