the main / Floor / Floor coverings / Tile / Is it possible to dry the screed to lay tile or not

Is it possible to dry the screed to lay tile or not

Many are interested in this process, like laying tiles on gypsum fiber board. Some do not even know, whether it can be carried out. In response, it should be noted, that the technology of this kind are already laying the years. Its popularity is due to the, that for leveling the surface of the sheet stacking gipsovolokonnyh, simply put, dry screed, It is the most convenient and can be carried out on sheets laying tile. At arrangement dry screed mostly in precisely laying tiles GOLS becomes the primary output, if you want to put a floor tile on the wooden floor. Besides, such coverage can be found in any other room. Such a floor is quite practical and has many advantages.

Features GVL bases

To begin with we shall understand, what GVL. It's simple enough, since this same sheet, the only difference that becomes improvement. In particular:

  1. The first difference becomes the absence of a bilateral frame.
  2. Besides, gypsum itself is reinforced with special cellulose components.
  3. Also notes the high level of water resistance and fire resistance, and above, than the GCR.

The sheet with the edge of GOLS
GOLS sheet edge, for quick installation
GVL letter
Conventional sheets GOLS, which require a double deck with overlap and sizing

Also of note and its greater strength, why GOLS sheets are used as dry base screed. In cases, when the work is carried out in wet areas, used specialized GVL, which has a higher level of moisture resistance.

Directly to the qualitative performance of works it is necessary to comply fully with the technology, which involves a phased implementation of the following GVL laying on the floor.dry screed to lay tile

floor arrangement technology

As mentioned, originally held a full dismantling of the old coating. The base is checked for any major defects, estimated overall. When the precariousness and the need being replaced individual floor elements (in case of the wooden surface).

Laying GVL

Now we need to talk a little about the features directly mounted GVL:

  1. It should be laid along the premises, which will reduce the amount of material.
  2. To consolidate and dressings recommended to use self-tapping screws or dowels. Fixing is carried out in steps 20 cm.
  3. Mandatory procedure after laying surface becomes primer, namely it will contribute to good adhesion with filler and tile.
  4. It is necessary to carry out a small shift in the joints it is necessary to accurately track. Limit 20 cm.GVL laying on the floor
  5. Also a good way to use this type of sheet is to create a two-layer floor. The thickness of the sheet is 20 mm. Besides, the material itself is easy to install and can significantly accelerate the repair process, because it does not need time for hardening solutions and other activities.

Laying tiles

In order, whether it is possible to dry the screed to lay tile or not, understood, and now you need to go directly to the very arrangement of the coating. The very laying is carried out on adhesive mixture. An important factor is the selection of its. must, adhesive coating to match, as indicated on the packaging. Also pay attention to the expiration date. Therefore, on a tile on gypsum fiber board and a glue for her to buy, better to consult in the shop.

note, that the stacking is performed only to dry the coating and primed. For work, we need the following tools:

  1. Rule and Level.
  2. rubber mallet.
  3. A set of spatulas.
  4. beacons.
  5. crosses.
  6. Primer.

tiling tool

To solve the problem, how to put the tiles on dry screed Knauf, start a day after priming. Stacking conducted as follows:

  1. It first determining the number of rows of tiles patterned with and without, as well as all fragments, to be cut.
  2. Next glue diluted in accordance with the instructions on the package.
  3. Using a spatula mixture was applied to the substrate and is leveled.
  4. Then notched trowel performed sulcus.both apply the adhesive to the surface
  5. On top of stacked tiles, at the same time it is pressed to the desired level.
  6. After stacking and alignment of each verified horizontal surface, if necessary, matched either.
  7. During arrangement is necessary to form the seams immediately, that is done by using special crosses or SVP.which crosses to choose tiles
  8. When laying tile in the corners of the room and at the junction of arrangement is carried out using special corners. They give maximum hold styling beautifully and evenly. They are often used in the work of experts, but for a beginner to work with such a device does not make the big work. We should also note that, that these corners (Trim) you can choose the color of the tiles, which will in some way, even to decorate the room.
  9. When tiling on joints stacking technology is not changing. Stacking continues usual manner.
  10. The most difficult option becomes cutting angle and styling. Especially when it comes to sharp corners in 45 degrees. In this case, the Tile. Alternatively, you can equip a special machine, which is equipped with a swivel mechanism. Respectively, the second option is much better, but because not everyone can find a machine.
  11. The last stage of laying becomes grouting. removed the crosses, and then with a rubber spatula to apply special composition.grout tile joints on the balcony
  12. In the case of grout in a bathroom or kitchen should be additionally applied to the seam sealer.

In the case of stacking wall grout performed immediately after the adhesive has dried, for floor tiles not previously, than 3 day. Besides, for drying, it is necessary to arrange suitable conditions, More specifically, minimum amount of moisture and steam. Also it should be noted, that the air temperature should be from 18 to 25 degrees.

Tips and tricks

Now we give a series of tips and tricks, that give professionals:

  1. Tile adhesive should be applied to a small area, which will be processed within 20 minutes. Otherwise, the adhesive will harden.
  2. All excess glue, which act during installation must be rectified immediately, otherwise, then remove them will be impossible.
  3. When installing gypsum fiber board is mandatory in the dressing between the sheets, which will provide greater resistance to stress.
  4. Before laying the tile flooring GVL must be kept for at least 3 day, then start primer and laying.
  5. When buying glue mixture you need to make sure, it is suitable for gluing sheets gipsovolokonnyh.
  6. The installation should be carried out only, when the primer is completely dry, while strictly following techniques, the above.

Following these recommendations, you can avoid a lot of problems and difficulties.

conclusion

In conclusion, it should be noted, that laying tiles on gypsum fiber is an excellent choice for decorating any surface and any room. The floors of this kind can boast a number of attractive features, in particular, heat- and acoustic characteristics. Such factors for residential building,especially for apartments, It is very important and necessary.

Share with your friends to vote record

Rate post:
1 Звезда2 Звезды3 Звезды4 Звезды5 Звезд (While no ratings)
Loading...
Do you want to place the information in this or any other article - contact, discuss.

Share your experience in the repair

Your email address will not be published. Required fields are marked *

14 − eight =