During the construction or repair, usually, there is a need for laying new pipes and electrical wiring. To do this, the walls and floor are made Stroebe - special channels, in that the heating pipes are laid and, sewer and water pipes, and electrical wires. Grooves in the pristine form does not look aesthetically pleasing, and the risk of damage increases significantly, therefore, it is necessary to plug the Stroebe. The repaired Grooves in the wall and how to choose the mix, to properly putty Stroebe.

Incorporation of cutting grooves for guiding

The first thing you need to decide with tools, which will be needed for the work. so, how to seal the wiring under Stroebe, need:

  1. spatulas (usually taken 15 and 120 cm);
  2. Primer;
  3. Brush;
  4. building plaster;
  5. gypsum solution (eg, Rotʙand).

Before the direct incorporation Stroebe, you need to treat them with primer. Why do it? The primer used for, to continue to avoid cracks in the plaster and its shedding, because in Stroebe always a lot of dust, which prevents plaster to adhere to the walls of devices.

The primer is necessary to apply a large richly, but narrow brush, and to get into hard to reach places, should drench them with primer, making a brush stroke. But it should be done carefully, not to slap all around.

Next you need to fix the wiring conventional plaster. Work is carried out quickly, tk. working with plaster can be just a few minutes, and it is not necessary to mix in a single large proportions. Attach the wiring must be an interval of 1 meter, so it will be held firmly enough.

Now you learn how to close up Stroebe. For this is taken plaster solution and troweled into Stroebe. Vazhnono follow certain rules.

First of all, itself solution should be more dense, than conventional plaster. Secondly, the solution should be applied crosswise, to Stroebe walls, not only vertically. So it is better to stick to the surface and do not create unnecessary mounds. Thirdly, remove excess solution should be, holding the trowel at a right angle from the outside, where the handle, rather than flat. In this way, plaster solution engages with the walls Stroebe much better, and it will look neater, tk. the solution is not reaching for the spatula. Remove excess solution should be 1-2 fold, that is enough. More information can be found by clicking on a solution link.

It should be borne in mind that when working with plaster or alabaster solution is only suitable 5 minutes. Rotband solution allows to work 20 minutes. Do not use ready-made solution when it started to set, he had already lost their properties.

Video:

Incorporation under the pipe cutting grooves

Putty cutting grooves in the wall of a pipe is analogous to, however, instead of plaster foam may be used for fastening pipes, and themselves insulated pipe with a shell of polyurethane foam or. Insulation of pipes to avoid germs seedlings, and securely fix the foam in pipe Stroebe. In general, the process is as follows: Stroebe cleaned of dust and hruntuyutsya, installed insulated pipe, then they are fixed with foam, and only then smeared plaster solution.

professional advice

Summing up, we should mention a few important points, which necessarily must be followed:

  • Primer. Mandatory when terminating cutting grooves like a pipe and a wiring;
  • Mandatory fixing pipes and wiring;
  • Plastering "herringbone" to the sample in the wall . This ensures better adhesion of the solution with the surface Stroebe;
  • Removal of excess solution with a spatula at right angles.

Gypsum solution dries, usually, for 24 o'clock. After this time, you can start a paintbrush wall decoration or ceiling.

Video:

Share with your friends to vote record

Rate post:
1 Звезда2 Звезды3 Звезды4 Звезды5 Звезд (1 assessments, the average: 1.00 of 5)
Loading...
Do you want to place the information in this or any other article - contact, discuss.

Share your experience in the repair

Your email address will not be published. Required fields are marked *

19 − nine =